Cement is in CBAM's first wave. Clinker made that inevitable.

The definitive regime is in force. From February 2027, EU buyers pay certificates against the emissions embedded in your cement and construction materials — calculated from your data, or from defaults that cost them more.

Live now — CBAM definitive regime since 1 Jan 2026 Feb 2027 — certificate purchases begin Process emissions — the core of cement's footprint

Three directions the pressure comes from

For cement and construction-materials producers in the Western Balkans, emissions data requests rarely arrive as one letter. They arrive as three.

Your EU buyer

CBAM data requests

Importers of covered cement products must declare embedded emissions — and need installation-level data from you, clinker included, to avoid costly default values.

Construction buyers

Embodied-carbon documentation

EU construction projects increasingly require embodied-carbon data for the materials they procure. Suppliers who can document it stay on the tender list.

Your bank

Green-lending conditions

Kiln and plant modernisation financing increasingly requires a GHG baseline — and cement is the definition of an energy-intensive borrower.

The platform

Your whole inventory, in one honest view

Consolidated footprint across facilities, scope breakdown to the GHG Protocol, monthly trends — and the gaps stated, not hidden.

app.karbon360.tech — Overview
Karbon360 overview dashboard: consolidated footprint, scope breakdown, monthly emissions and data coverage
Calculation trace — every record
Emission factornational grid · sourced
Factor versiondocumented
Server recomputationmatch ✓
Actual product — demonstration data. UI available in Albanian and English; reports export in English.

Every figure can show its work

This is what your buyer's verifier gets from a Karbon360 inventory: each record stores its activity data, the exact factor and version applied, and a server-side recomputation. When something doesn't reconcile, the platform flags it — before the verifier finds it.

  • Installation-level records — facility by facility, month by month.
  • Process emissions for cement, clinker and lime built in, alongside combustion.
  • Factors named and versioned, disclosed to the report recipient.
  • Reconciliation checks that state discrepancies instead of smoothing them.

Written for reviewers: the methodology page.

Karbon360 records view with a calculation trace panel: formula, factor version, server recomputation and reconciliation flag
Actual product — demonstration data

What "good data" means in this sector

Cement's footprint is dominated by calcination — CO2 released from the limestone itself, independent of fuel. That makes proper process-emissions accounting non-negotiable. What your buyer's verifier needs to see:

The cement producer's data package

  • Production volumes per installation — monthly, reconciled with your records.
  • Fuel consumption by type — kilns, generators, machinery, fleet.
  • Electricity consumption — calculated with your country's actual grid factor, not an EU average.
  • Process emissions from calcination — clinker and lime, measured, not inferred.
  • Factors and documentation — named, versioned sources, and a calculation a third party can re-trace.
Energy efficiency alone can't fix cement's number — but honest accounting changes what it costs you. Because calcination emissions come from the raw material, defaults that overstate them are expensive to accept silently. Measured, documented actuals — process and energy separated properly — are the version of your footprint you can defend, and the cheaper one for your buyer.

The full CBAM picture — timeline, the 50-tonne rule, defaults — is on our CBAM page.

Two ways to start

Depending on whether the request is already on your desk.

A buyer has already asked

Tell us what was requested and your production setup. We'll map exactly what you need to have in place — concretely, before your deadline.

Talk to our team

Not yet — but it's coming

Get a rough footprint estimate and the CBAM evidence checklist for your company. Free, about five minutes.

Get your estimate

Frequently asked questions

Yes — cement is one of CBAM's original sectors, including clinker. EU importers of covered cement products must account for embedded emissions, and from February 2027 they pay certificates against them.

Calcination releases CO2 from the limestone itself, independent of fuel — typically the majority of a cement plant's footprint. A credible inventory measures process emissions properly instead of inferring them from energy use.

Your buyer uses conservative Commission default values, which typically overstate emissions — and that overstatement becomes certificate cost on your goods from February 2027. Credible actual data makes you the cheaper supplier.

Increasingly, yes — embodied-carbon documentation is entering EU construction procurement. The same measured, traceable inventory that serves a CBAM request is what those buyers accept.